In July 2022, the land bridge – Pelješac (Pelješki most) with access roads will be officially opened.
Ivica Granić, B.Sc.Civil Engineering, as part of the Contractor’s team, engaged and appointed Work Manager during the construction of the pavement structure of the bridge, the construction of waterproofing systems, pre-tensioning work, the installation work of the inclined tension system, the installation work of the steel span structure of the bridge, as well as in quality control and implementation of EU standards in the field of steel structures.
Link: https://hrvatske-ceste.hr/hr/most-peljesac
Link: https://www.youtube.com/watch?v=oZ4ci418oRY
Link: https://www.linkedin.com/posts/igranic_peljeagpkimost-peljesacbridge-connectingcroatia-activity-6957317439969726464-jf4v?utm_source=share&utm_medium=member_desktop
Location: Komarna, Brijesta, Dubrovnik-Neretva County
Project realization period: 2018 – 2022
Client: HRVATSKE CESTE d.o.o.
Services on the project: Engineer, Works Manager