In July 2022, the land bridge – Pelješac (Pelješki most) with access roads will be officially opened.

Ivica Granić, B.Sc.Civil Engineering, as part of the Contractor’s team, engaged and appointed Work Manager during the construction of the pavement structure of the bridge, the construction of waterproofing systems, pre-tensioning work, the installation work of the inclined tension system, the installation work of the steel span structure of the bridge, as well as in quality control and implementation of EU standards in the field of steel structures.

Link: https://hrvatske-ceste.hr/hr/most-peljesac

Link: https://www.youtube.com/watch?v=oZ4ci418oRY

Link: https://www.linkedin.com/posts/igranic_peljeagpkimost-peljesacbridge-connectingcroatia-activity-6957317439969726464-jf4v?utm_source=share&utm_medium=member_desktop

Location: Komarna, Brijesta, Dubrovnik-Neretva County

Project realization period: 2018 – 2022

Client: HRVATSKE CESTE d.o.o.

Services on the project: Engineer, Works Manager